Case Study: South Bromsgrove High

Timber Retaining Structure

Changing Accommodation

Macadam Pathways and Hard Standings

Landscaping and Planting

South Bromsgrove High is considered an outstanding school in all areas - achievement, quality of teaching, leadership, behaviour and overall effectiveness. Sport is an important part of School life and the school produces, supported by clubs, many county, regional and national performers across a range of sports.

Their new 3G Football Turf facility, also intended for local community use, includes self-contained changing accommodation adjacent to the 106m x 70m pitch which is designed for full size, 9, 7 and 5 a side play.

Slatter Surfacing & Civils completed a range of important infrastructure works of which the extensive timber retaining wall is a particular and impressive feature. Our project team headed by Contracts Manager Steve Ayres also prepared the necessary foundation and utility services for the changing accommodation. Macadam pathways and hard standings were constructed for players and spectators with profiled landscaping and planting to adjacent areas.

Facility

Timber retaining wall structure.

Fully serviced modular self-contained changing accommodation.

Macadam pathways and hard standings.

Profiled landscaping and planting.

The new 3G Astroturf Pitch has been installed professionally and efficiently by S&C Slatter to the highest FIFA 1* Standard. The students at South Bromsgrove ‘love’ the facility and the quality of football at all levels of ability has improved in such a short time.

This is a fantastic facility for both the school and wider community.

Dave Bayliss, 3G ATP Project Manager